Tag: Wirsbo hePEX™

JFK’s New Terminal One features the largest radiant floor heating and cooling system in North America

Slated to open in phases, Phase A of the 2.6 million-square-foot facility — the largest such international terminal in the United States — will be primarily heated and cooled with nearly 500,000 SF of PEX-a tubing embedded in its floors.  

By Brock Johnson, CPM

QUEENS, NY — Bragging rights for the largest radiant in-floor heating and cooling installation in North America now likely belong to New York City’s $9.5 billion New Terminal One (NTO) at John F. Kennedy International Airport. At the very least, with roughly 11 acres of Uponor PEX-a tubing expertly designed and installed in-slab and under one roof, the resplendent NTO has as strong a claim as any to being the biggest.

Florida Mechanical Contractor Cuts Installation Costs 70% with Prefabricated Hydronic Piping System

Tampa-based Colwill Engineering smoothly combines Uponor’s new pipe prefabrication services with timely job-site deliveries from local distributor Winsupply to sharply reduce installation time and crew size on prestigious Society Orlando high-rise apartment construction project.

ORLANDO, FL — Prefabrication has become the name of the game in mechanical contracting. Nothing particularly new there — unless we’re talking who, besides the installing contractor, might actually be doing the prefab work.

Minnesota family’s new, healthy “forever home” features PEX-based plumbing and radiant systems

Veteran pipefitter and longtime PEX installer Justin Johnson chooses Wirsbo hePEX™ (radiant heating) and Uponor AquaPEX® (plumbing) to boost the health, comfort, and energy efficiency of his new home.

AFTON, MINNESOTA — Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction. Johnson has worked as a union pipefitter in the plumbing and HVAC industries on a variety of commercial, industrial, and residential projects since the mid-1990s. Now, the 25-year industry veteran would have the opportunity to install many of the same comfort-enhancing and energy-efficient systems inside his new, 4,600-sq.-ft. home.

University of Iowa Visual Arts Building masterfully integrates striking aesthetics with innovative mechanical systems

Five-story, 126,000-square-foot, LEED® Gold building features numerous structural and mechanical innovations, including a thermally activated, bubble-deck slab, providing radiant cooling as well as radiant heating on six levels.

BY JOHN O’REILLY

IOWA CITY, IOWA — The Visual Arts Building (VAB) at the University of Iowa is a marvel of both aesthetic design and mechanical engineering. Six years in the making and completed in October 2016, the award-winning, 126,000 square-foot structure blends the artistry of the renowned Steven Holl Architects (New York) with an array of innovative mechanical systems that smoothly integrate with Holl’s aesthetics while meeting the numerous, industrial-like requirements of this challenging space.